Отображение единичного результата.

48MW Pratt & Whitney FT8

4.350.000

YoM: 1995
Fuel: Dual (Gas and Oil)
1st Unit
Gas Turbine
Power Plant Gas Turbine: PW FT8-1 Twin Pac (Double-Connection), Year: 1995
Power: 48MW
Voltage: 11kV
Hours: 18,000 Hours
Other Parts: Transformer, 110kV Up-Voltage Plant, Discharge Oil Pump,
Sewage Oil Pump, Fuel Oil Pump Room (MCC), year: 2010, hours: 10 Hours

12.9 MW 2017 Siemens SGT 400 Natural Gas Turbine 2017

6.900.000
With full warranty BRAND NEW (from a cancelled project)
• Combustor Standard: Dual Fuel DLE • Power: 12,9MW and 50Hz • Testing: Factory tested
• Hours Operation: No operational running
• Storage Location: EMEA
• Delivery: FAS port of export
Price: Upon request
Delivery : Immediate
*5 Siemens SGT 400 Natural Gas Turbines Available

Unused 12MW x 3 Gas Turbine Power Plant

12.500.000

Condition: Never used
Manufacturing year: 2013
Turbine make: MAN (Germany)
Generator make: ELIN MOTOREN (Austria)
Fuel:Dual fuel system(Diesel or Gas)

5 (five) UNUSED FT-8 Mobile PAC Gas turbine 30 MW

14.100.000
  • Installed in 14 countries worldwide
  • Provides reliable power ranging from single-unit applications to multi-unit sites
  • 30 MW mobile power plant
  • Environmentally compliant
  • Easily installed within a small footprint with minimal site requirements
  • EU and GOST certified

Автомобиль-амфибия

Мы продаем автомобиль-амфибию мощностью 100 тонн, пригодный для использования в строительной и горнодобывающей промышленности. С помощью машины можно перемещать минеральные пески с берега на корабль в труднодоступных местах без портов и островов.